The specification
Cedar, as a specifier needs it
Formats, minimums and honest lead times.
- 01ProductsCarved doors, coffered ceilings, mashrabiya, wall panelling, furniture frames.
- 02DryingKiln-dried to 10–12% MC for export — mandatory for heated interiors.
- 03MOQ & leadPer piece · doors 6–10 weeks; a coffered ceiling 3–4 months.
- 04Where it belongsDoors and ceilings first; anywhere scent and presence matter.
From the trade desk
The one thing to get right
Always tell us the destination climate. A door for Dubai and a door for Stockholm are dried, jointed and finished differently — at the workshop, not after.
Specifying cedar?
Order the sample box or send your quantities for an itemised quote.