Home — For professionals — Construction companies
For construction companies
Materials that land on schedule
Site-phased deliveries, export crating, fumigation and papers handled at our end — so the programme never waits on Morocco.
What you get
Built for a site programme, not a shopping cart
Deliveries phased by zone
We hold the balance in our warehouse and release crates to your programme instead of dumping a container on a live site.
One firing batch, 10% held back
Shade varies between firings. We reserve overage from the same batch for cuts, breakages and snagging.
Export crating that survives the road
Timber crates, corner protection, palletised and strapped — not cartons stacked in a box.
Papers handled at our end
EUR.1 movement certificate, fumigation, phytosanitary, packing list and commercial invoice issued together.
Photo QC before the doors close
Stage photos through firing, cutting and packing, plus loading photos with the seal number.
One project manager on the ground
Based in Fes, walking the workshops, chasing the schedule and reporting in your language.
How it works
How a site package is delivered
You give us the areas and the dates. We produce, inspect, crate and land it phase by phase.
Open a contractor account →- 01Send the take-offAreas by zone in sq ft, finishes and your programme dates.
- 02Priced scheduleOne quote covering every craft, with lead times mapped to your phases.
- 03Reference sampleA physical sample per finish approved before we commit the batch.
- 04Batch productionFired and cut in one run so shade stays consistent across the job.
- 05Phased shippingCrates released drop by drop, manifested by zone and labelled for the site.
Minimums and lead times
What a site package looks like
Indicative and negotiable. Larger runs cut the per-unit cost; custom work extends the lead time.
| Element | MOQ | Lead time | Notes |
|---|---|---|---|
| Zellige mosaic | 55 sq ft | 5–7 weeks | Hand-cut, 40+ glaze codes |
| Bejmat & cement tiles | 225 sq ft | 4–6 weeks | 8 × 8 in and 2 × 6 in formats |
| Cement tile borders | 65 lin ft | 4–6 weeks | Priced per linear foot |
| Carved plaster (tadelakt / gebs) | 50 lin ft | 6–8 weeks | Made to drawing, by quote |
| Carved wood ceilings | 125 sq ft | 8–10 weeks | Cedar, by quote |
| Doors & gates | 4 units | 8–12 weeks | Custom size, by quote |
| Sea freight to EU | — | 3-day sailing | Tanger Med to Algeciras / Marseille |
Registration
Open a contractor account
Send the take-off and the programme. You get a priced schedule and a named project manager — no account, no fee, no obligation.
- 01Phased releases — crates land when the zone is ready, not before
- 02Overage reserved — 10% from the same batch, held six months
- 03Papers complete — EUR.1, fumigation and manifests issued with the load
- 04One contact — your project manager in Fes, reachable on WhatsApp
No account needed · Answered by a person, not a bot
Questions