02Timeline7 months request-to-delivery, phased in two sailings to match the construction schedule.
03The hard partUL certification on the lighting — solved by wiring in Fes to spec and certifying through the client’s US lab.
04LessonUS hospitality projects should route compliance questions to us at RFQ stage, not after design freeze.
The story
How it went
The designer specified from our material library and sample boxes without visiting Morocco; the entire approval loop ran on DHL and photo reports. The second container option was exercised mid-project to add the lobby wall — priced within 48 hours because the glaze codes were already on file.