الكتالوج التجاري
كراسي مغربية
Moroccan chairs bring handcrafted seating to hospitality, retail and interior-design projects. Explore the collection, then request dimensions, quantities, specifications and delivery options. For trade orders and project planning, read the Moroccan Craft Procurement Guide before requesting a quote.
- التسعير
- بعرض سعر
- الحد الأدنى للطلب
- ابتداءً من 20 قطعة
- مدة التنفيذ
- 4–10 أسابيع
- الشروط
- تسليم الدار البيضاء (FOB)
-
Handcrafted Moroccan Metal Chair - Elegant Iron Seating
5–8 weeks التخصيص ممكن Powder-coated, contract gradeموثَّق Fès metal workshops
-
Handcrafted Moroccan Metal Chair 035 - Elegance and Durability
5–8 weeks التخصيص ممكن Powder-coated, contract gradeموثَّق Fès metal workshops
-
Handcrafted Moroccan Wood Chair with Mahogany Wood Craftsmanship
6–9 weeks التخصيص ممكن Natural or stainedموثَّق Fès joinery workshops
-
Handcrafted Moroccan Wood Chair with Thonet-Style Design
6–9 weeks التخصيص ممكن Natural or stainedموثَّق Fès joinery workshops
-
Handmade Moroccan Metal Chair | Artisan-Crafted Iron Furniture
5–8 weeks التخصيص ممكن Powder-coated, contract gradeموثَّق Fès metal workshops
-
Luxurious Handcrafted Moroccan Wood Chair
6–9 weeks التخصيص ممكن Natural or stainedموثَّق Fès joinery workshops
-
Luxurious Moroccan Dark Brown Wood Chair | Handcrafted Elegance
6–9 weeks التخصيص ممكن Natural or stainedموثَّق Fès joinery workshops
-
Luxurious Moroccan Wood Chair with Camel Bone Accents
6–9 weeks التخصيص ممكن Natural or stainedموثَّق Fès joinery workshops
-
Luxurious Pink Fluffy Metal Chair - Hand-Forged Moroccan Design
5–8 weeks التخصيص ممكن Powder-coated, contract gradeموثَّق Fès metal workshops
-
Luxury Moroccan Camel Bone Inlaid Wood Armchair
6–9 weeks التخصيص ممكن Natural or stainedموثَّق Fès joinery workshops
-
Luxury Moroccan Wood Chair - Handcrafted Elegance & Comfort
6–9 weeks التخصيص ممكن Natural or stainedموثَّق Fès joinery workshops
-
Metal Heart-Forged Chair 060 – Moroccan Artisan-Crafted Elegance
5–8 weeks التخصيص ممكن Powder-coated, contract gradeموثَّق Fès metal workshops
-
Modern Hand-Forged Yellow Metal Chair for Indoor/Outdoor Use
5–8 weeks التخصيص ممكن Powder-coated, contract gradeموثَّق Fès metal workshops
-
Modern Moroccan Metal Chair - Handcrafted Iron Artistry
5–8 weeks التخصيص ممكن Powder-coated, contract gradeموثَّق Fès metal workshops
-
Modern Moroccan Yellow Metal Chair - Hand-Forged Design
5–8 weeks التخصيص ممكن Powder-coated, contract gradeموثَّق Fès metal workshops
-
Moroccan Artisan Metal Chair 074 | Handcrafted Iron Chair
5–8 weeks التخصيص ممكن Powder-coated, contract gradeموثَّق Fès metal workshops
-
Moroccan Floral Wood Chair - Handcrafted Teak Furniture
6–9 weeks التخصيص ممكن Natural or stainedموثَّق Fès joinery workshops
-
Moroccan Hand-Carved Cedarwood Wood Chair with Dark Brown Leather Seat
6–9 weeks التخصيص ممكن Natural or stainedموثَّق Marrakech cedar joinery
-
Moroccan Hand-Carved Teak Wood Chair with Floral Panels
6–9 weeks التخصيص ممكن Natural or stainedموثَّق Fès joinery workshops
-
Moroccan Hand-Carved Wood Chair | Elegant Home Decor
6–9 weeks التخصيص ممكن Natural or stainedموثَّق Fès joinery workshops
-
Moroccan Hand-Carved Wood Chair | Luxurious Design
6–9 weeks التخصيص ممكن Natural or stainedموثَّق Fès joinery workshops
-
Moroccan Hand-Carved Wood Chair with Floral Panels
6–9 weeks التخصيص ممكن Natural or stainedموثَّق Fès joinery workshops
-
Moroccan Hand-Crafted Cedar Wood Chair with Leather Seat
6–9 weeks التخصيص ممكن Natural or stainedموثَّق Marrakech cedar joinery
-
Moroccan Hand-Forged Black Metal Chair | Modern Style & Comfort
5–8 weeks التخصيص ممكن Powder-coated, contract gradeموثَّق Fès metal workshops
مراحل العمل
من أول بريد إلكتروني إلى فتح الصندوق
عملية منظَّمة صقلتها تسعة أعوام من التصدير، حتى لا يقامر المشتري الخارجي أبداً.
-
01
اليوم 0–1
أرسل طلبك
تكفي الرسومات أو المراجع أو قائمة تقريبية. نطابقها مع ورش مدقَّقة ونعود إليك بعرض سعر مفصَّل يشمل أسعار الوحدات والحد الأدنى للطلب ومدد التنفيذ.
-
02
الأسبوع 1–3
العينة والتأكيد
تُشحن إليك عينات فعلية. تُعتمد التزجيجات والتشطيبات والأبعاد كتابياً قبل دخول أي شيء مرحلة الإنتاج.
-
03
قيد الإنتاج
نشرف على مراقبة الجودة
يفحص فريقنا في كل مرحلة ويرسل تقارير مصوّرة. لا يُشحن شيء ما لم نكن نحن أنفسنا مستعدين لاعتماده.
-
04
الأسبوع 8–14
الشحن المجمَّع
تُحمَّل عدة ورش في حاوية واحدة. نتولى أوراق التصدير والتبخير والتعبئة، تسليم الدار البيضاء أو حتى بابك.
جاهز لتسعير مشروعك؟
أرسل الرسومات أو لوحة الإلهام أو قائمة تقريبية. يصلك عرض سعر مفصَّل بأسعار الوحدات والحدود الدنيا ومدد التنفيذ خلال 48 ساعة — من إنسان لا روبوت.